LICENSEE OVERVIEW


  • EON SEZ I
  • EON SEZ II

EON SEZ I

INFRASTRUCTURE

  • In future power will be supplied through proposed 132/22 kV Gas Insulated Switchgear (GIS) Substation especially built for EON SEZ I & II.

  • N+1 redundancy in distribution transformer.

  • Alternate Bus Riser available at LT Side if there is failure/shutdown in Main Bus Riser.

  • 22 kV feeders from EHV Substations of MSETCL to ensure adequate redundancy.

  • 22/11 kV Indoor Substation.

  • Total 10MVA x 2 no’s of Power Transformers

  • Ring Main units for uninterrupted power supply

  • Automated Meter Readings (AMR) to record energy consumption

DISTRIBUTION LOSS

  1. FY 20-21 – 0.78%

RELIABILITY INDICES

EON SEZ I SAIDI SAIFI CAIDI
FY 20-21 0.00 0.00 0.00

LOAD PROFILE

graph

EON SEZ II

INFRASTRUCTURE

  • In future power will be supplied through proposed 132/22 kV Gas Insulated Switchgear (GIS) Substation especially built for EON SEZ I & II.

  • N+1 redundant distribution transformer Capacity (2500 KVA x 8no’s of Distribution Transformers.

  • Alternate Bus Riser available at LT Side if there is failure/shutdown in Main Bus Riser.

  • Ring Main units for uninterrupted power supply.

  • Automated Meter Readings (AMR) to record energy consumption

DISTRIBUTION LOSS

  1. FY 20-21 – 0.71%

RELIABILITY INDICES

EON SEZ I SAIDI SAIFI CAIDI
FY 20-21 0.00 0.00 0.00

LOAD PROFILE

graph